Bay Area Images

A Waterfront Development in Marin County
San Rafael
Marin County

Air District Fact

The District’s Air Monitoring Network includes two portable air monitoring stations. These stations are placed in communities of interest for one to two years in order to compare local air measurements with those obtained by the agency’s monitoring network

Give Us Your Feedback



select


(500 character limit)
 

I would like a response.
(Allow 5-7 business days)
 

 

Utility Buttons

  • Email This Page
  • Print
  •  Save & Share Share

BAAQMD Webcasts

Recent Webcasts

5/16/2012
Board of Directors Special Meeting

More Information:
5/16/2012 Agenda
(442 kb PDF, 8 pgs)

5/2/2012 Board of Directors Meeting
More Information:
5/2/2012 Agenda
(1 Mb PDF, 52 pgs)

4/18/2012 Board of Directors Meeting
More Information:
4/18/2012 Agenda
(4 Mb PDF, 315 pgs)

Board Archives

Agendas, Minutes and Media

HelpWebcast Support
System & player requirements, RSS feeds & mobile alternatives.

BAAQMD on iTunes

iTunes Audio Podcasts
iTunes Video Podcasts

Contacts

Individuals

  • Daphne Chong
  • Toxicologist, Engineering
  • 415 749-4687
  • Scott Lutz
  • Air Quality Engineering Manager, Engineering
  • 415 749-4676

Groups

Engineering

415 749-4990

Engineering Contacts
Full BAAQMD Directory

Toxic Air Contaminant Trigger Levels

New Source Review of Toxic Air Contaminants:

The following link is an Adobe Acrobat copy of Table 2-5-1 from Regulation 2 Rule 5, New Source Review of Toxic Air Contaminants.

This table lists Toxic Air Contaminants (TAC) and their trigger levels. Regulation 2, Rule 5 specifies that all permit applications for new and modified sources must be screened for emissions of TACs. If any project emits TACs in amounts that exceed the listed trigger levels, a site-specific Health Risk Screening Analysis (HRSA) is completed by District staff. Estimates of public exposure, and cancer and non-cancer health risk, are made for the maximally exposed residential and off-site worker receptor locations and compared to risk standards (Regulation 2-5-301 and 302). If the emissions from a project are less than the listed trigger-levels, it is assumed that the project does not pose a significant risk to the public and a HRSA is not performed.

Permit Exemptions

If TAC emissions are equal or greater than one or more of the trigger-levels, a HRSA may be necessary to determine if a source is exempt from permit requirements (see Regulation 2-1-316).

Last Updated: 10/4/2010