Bay Area Images

Air District Fact

Air District staff interact with the public on a one-to-one basis through participation in many community, county, health and transportation fairs as well as other large-scale events around the Bay Area. An attractive display showcases the work of the Air District and provides a backdrop for our many informational materials.

Give Us Your Feedback



select


(500 character limit)
 

I would like a response.
(Allow 5-7 business days)
 

 

Utility Buttons

  • Email This Page
  • Print
  •  Save & Share Share

BAAQMD Webcasts

Recent Webcasts

5/16/2012
Board of Directors Special Meeting

More Information:
5/16/2012 Agenda
(442 kb PDF, 8 pgs)

5/2/2012 Board of Directors Meeting
More Information:
5/2/2012 Agenda
(1 Mb PDF, 52 pgs)

4/18/2012 Board of Directors Meeting
More Information:
4/18/2012 Agenda
(4 Mb PDF, 315 pgs)

Board Archives

Agendas, Minutes and Media

HelpWebcast Support
System & player requirements, RSS feeds & mobile alternatives.

BAAQMD on iTunes

iTunes Audio Podcasts
iTunes Video Podcasts

Contacts

Individuals

  • Daphne Chong
  • Toxicologist, Engineering
  • 415 749-4687
  • Glen Long
  • Supervising Air Quality Engineer, Engineering
  • 415 749-4659
  • Scott Lutz
  • Air Quality Engineering Manager, Engineering
  • 415 749-4676
  • Jane Lundquist
  • Principal Air Quality Engineer, Engineering
  • 415 749-4675

Groups

Engineering

415 749-4990

Engineering Contacts
Full BAAQMD Directory

Regulation 2, Rule 5: New Source Review of Toxic Air Contaminants

Regulation 2, Rule 5 replaced the District’s Risk Management guidelines on July 1, 2005. This rule provides preconstruction review for potential health impacts from new and modified sources of toxic air contaminants. Toxic emissions are estimated for all sources within a proposed project; if emissions from a proposed project exceed the trigger levels in Table 2-5-1, a Health Risk Screening Analysis (HRSA) is required to determine project risk and risk from each source.

Risk standards are:

2-5-301 Best Available Control Technology for Toxics (TBACT) Requirement:

The applicant shall apply TBACT to any new or modified source of TACs where the source risk is a cancer risk greater than 1.0 in one million (10 E-6), and/or a chronic hazard index greater than 0.20.

2-5-302 Project Risk Requirement:

The APCO shall deny an Authority to Construct or Permit to Operate for any new or modified source of TACs if the project risk exceeds any of the following project risk limits:

302.1 A cancer risk of 10.0 in one million (10 E-6).

302.2 A chronic hazard index of 1.0.

302.3 An acute hazard index of 1.0.

HRSA Form – Health Risk Screening Analysis:

An HRSA Form is required for each source within the proposed project (see Forms on right). Maps should be included to clarify locations of site, sources, buildings, and receptors.

Health Risk Screening Analysis Guidelines:

If an HRSA is required by Regulation 2, Rules 1 or 5, the analysis will be conducted in accordance with the District’s Health Risk Screening Analysis Guidelines. These guidelines are maintained on the District’s web site and specify, or contain references to, the procedures for determining acute hazard index, chronic hazard index, and cancer risk. In general, these guidelines conform to the Health Risk Assessment Guidelines established by OEHHA for use in the Air Toxics Hot Spots Program. The District HRSA Guidelines will be periodically updated, typically after significant changes have been made to OEHHA’s HRA Guidelines.

Last Updated: 10/4/2010